Raipur PWS Scheme


SALIENT FEATURES

1

Name of Scheme

Raipur Block W/S Scheme

2

Name of District

Bankura

3

Name of Block

Raipur

4

Source of Water

Sub-surface water of River Kangsabati.

5

Location and justification of the Scheme

The ground water potential in the area is not adequete i.e. it has been proposed to abstract sub-surface water by sinking river bed tube well in the River Kangsabati, flowing adjacent to the command areas.

6

Number of Mouzas / Villages to be covered

26 (Twenty six)

7

Census population(2011) to be covered

34612

8

Expected date of Commissioning

2016

9

Design Year

2036

10

Present percapita service lavel

70 lpcd

11

Treatment plant capacity (if WTP is provided)

-------

12

Period of Treatment and supply(Proposed)

Supply:- 8 hrs. /day

13

Treatment process in brief(Proposed)

Disinfection   by Chlorination

14

Proposed Length of Rising Main(both raw and clear water) in km

23.5 km

15

Proposed Length of Distribution System pipelines (in KM)

86.0 km

16

Proposed No of water Reservoirs with capacity

Total:- 3 nos.
2 nos.-150m3
1 no.-50m3

17

Proposed No of Over head  Reservoirs with capasity

2nos.
Capacity 600m3

18

Any Special feature of scheme if any

 

1

Name of Scheme

Raipur Block W/S Scheme

2

Name of District

Bankura

3

Name of Block

Raipur

4

Source of Water

Sub-surface water of River Kangsabati.

5

Location and justification of the Scheme

The ground water potential in the area is not adequete i.e. it has been proposed to abstract sub-surface water by sinking river bed tube well in the River Kangsabati, flowing adjacent to the command areas.

6

Number of Mouzas / Villages to be covered

26 (Twenty six)

7

Census population(2011) to be covered

34612

8

Expected date of Commissioning

2016

9

Design Year

2036

10

Present percapita service lavel

70 lpcd

11

Treatment plant capacity (if WTP is provided)

-------

12

Period of Treatment and supply(Proposed)

Supply:- 8 hrs. /day

13

Treatment process in brief(Proposed)

Disinfection   by Chlorination

14

Proposed Length of Rising Main(both raw and clear water) in km

23.5 km

15

Proposed Length of Distribution System pipelines (in KM)

86.0 km

16

Proposed No of water Reservoirs with capacity

Total:- 3 nos.
2 nos.-150m3
1 no.-50m3

17

Proposed No of Over head  Reservoirs with capasity

2nos.
Capacity 600m3

18

Any Special feature of scheme if any