SALIENT FEATURES

1

Name of Scheme

West Bengal Piped Water Supply Project (Purulia)

2

Name of District

Purulia

3

Name of Block

Purulia I,Purulia II,Para,Hura,Puncha,Kashipur,Raghunathpur I ,Manbazar I & Barabazar

4

Source of Water

Surface water of Panchet Dam,Suface water of other impunding reservoirs  under the control of I& W,Some water bodies under private ownership,Sub surface water of River Kangsabati,Kumari ,Dwarakeswar

5

Location and justification of the Scheme

To provide safe and adequate drinking water supply to people in the Purulia District suffering from acute scarcity of potable water,  thereby improving health and quality of life in the district.In absence of piped water supply scheme with sustainable source in most of the areas of the district, people of the area depend mainly on deep masonry wells / hand tube wells. During summer most of the aforesaid sources are often dried up due to excessive lowering of ground water table rendering acute crisis of drinking water in the region. Percentage of total rural population covered by piped water supply scheme in the district is considerably  low  in comparison to that of the state average. Also percentage of fluoride affected population (as per census 2001) is 10.86 % .

6

Number of Mouzas / Villages to be covered

1098 Mouzas, 2 CT

7

Census population(2011) to be covered

10,46,758

8

Expected date of Commissioning

Feb,2019

9

Design Year

2036

10

Present percapita service lavel

70

11

Treatment plant capacity (if WTP is provided)

6353 KLD

12

Period of Treatment and supply(Proposed)

16 hrs , 8 hrs respectively

13

Treatment process in brief(Proposed)

Conventional WTP, Pressure filter with chlorination and Chlorination depending on source of water

14

Proposed Length of Rising Main(both raw and clear water) - Percentage of total rural population covered by piped water supply scheme in the district

540 km(approx) ,                                                                                         
35%  of Population will be covered under this project

15

Proposed Length of Distribution System pipelines (in KM)

3300 km (approx.)

16

Proposed No of water Reservoirs with capacity

45 nos , Capacity 50 m3 to 500 m3 

17

Proposed No of Over head  Reservoirs with capasity

110 nos ,Capacity 100 m3 to 750 m3

18

Any Special feature of scheme if any

Day to day operation and maintenance of the Dist System shall be executed by VWSC who will collect tariff from Households and PHED shall raise monthly bills for production of water to VWSC who will pay cost of bulk water to PHED and rest shall be utilised for O & M of Dist Systems