Balupur PWS Scheme


SALIENT FEATURES

 1

Name of Scheme

Balupur

 2

Name of District

Malda

 3

Name of Block

Ratua-I

 4

Source of Water

Surface water from river Fulahar

 5

Location

24 nos. arsenic affected mouzas of Ratua-I Block.

 6

Justification of the Scheme

To mitigate arsenic problem in 24 nos. arsenic affected mouzas of Ratua-I Block.

 7

Number of Mouzas

24 Nos.

 8

Census Population (2011) Covered

54390

 9

Year of Commissioning

Commissioned in the year 2007

 10

Design Year

2028 AD

 11

Present per capital service level

61 LPCD

 12

Treatment plant capacity (if WTP is provided)

5.23 MLD

 13

Period of Treatment and supply

Clear water pumping : 16 Hrs.

Distribution pumping: 8 Hrs.

 14

Treatment process in brief

Raw water intake, Pre-chlorination, coagulation & Sedimentation at tube settler, Filtration by rapid gravity filter,clear waterstorage at CWR and supply to 3 nos. OHR’s.

 15

Length of Rising Main (both raw and clear water) in Km.

12.750 Km. (DI pipe 250 & 200 mm dia.)

 16

Length of Distribution system pipelines (in KM)

56.559 Km.

 17

No of water Reservoir with capacity

(i)           1 No. : 325 M3 (CWR)

(ii)         Back wash water tank : 300 M3;12.5 Mtr. staging height

 18

No of Over Hear Reservoir with capacity

3 nos. ;(i)700 M3, (ii)700 M3&(iii)250 M3

 19

Any Special feature of scheme if any

NA