• OPENCMS 10.5
    CONTENT MANAGEMENT MADE EASY
  • BOOTSTRAP BASED APOLLO TEMPLATE
    BUILD YOUR WEBSITE WITHOUT CODING
  • 100% OPEN SOURCE
    COMMERCIAL SUPPORT AVAILABLE
  • MAKE YOUR CONTENT MANAGERS HAPPY!
  • DON'T WAIT
    START USING OPENCMS TODAY

JICA Assisted Project

Home > Information > JICA Assisted Project

Salient Features


To provide safe and adequate drinking water supply to people in 9(Nine) Blocks in Purulia District suffering from acute scarcity of potable water, by constructing piped water supply schemes, thereby improving health and quality of life in the district.

  • Water Treatment Plant of capacity 6353 KLD at Raghunathpur I with Intake, Raw Water Pumping Station and Raw water & Clear water Reservoir of required capacity.
  • Construction of 460 horizontal/vertical River Bed Tube Wells (RBTWs) as sub surface water intake.
  • Transmission pipeline of MS and DI of varying sizes
  • Clear Water transmission /transfer pumping stations at various locations.
  • River bed T/W to draw sub surface flow & pumping station at various locations.
  • Raw Water Rising Main System for 45 nos different schemes.
  • Village distribution system in 45 nos. Different schemes.
  • Construction of 118 nos overhead reservoir of capacity 150 m3 to 500m3.
  • Procurement and installation of mechanical and electrical equipments for relevant water supply schemes.
  • Information, Education and Communication activities in villages.
  • Proper disinfection arrangement of raw water.
  • Supervisory Control and Data Acquisition system.
  • Operation and Maintenance.

    Description
NIT 03 of 2017-2018 of PMU : "Construction of boundary fencing with concrete posts and barbed wire including MS Gate at different OHR sites under WBPWSP(Purulia), PHE Dte at (i) Bamundiha Mouza (JL No 041) (Plot No 1108) & (ii) Laxmanpur Mouza (JL No 95) (Plot No 169)"
  WBF 2911/(i)/(ii)
NIT 02 of 2017-2018 of PMU : "Guarding arrangement through registered farm organised by Ex-military person for PMU office, WBPWSP(Purulia), PHE Dte at Pragati Plaza, Ranchi Road, Purulia (w.e.f 01/09/2017 to 30/04/2018)"
  WBF 2911/(i)/(ii)
EOI 02 of PMU of 2017-2018 : "Providing Contractual Engagement of Supporting Staff under Project Management Unit for implementation of JICA assisted West Bengal Piped Water Supply Project (Purulia)"
  Technical Proposal of EOI 02 of PMU of 2017-2018
  Financial Proposal of EOI 02 of PMU of 2017-2018.
Expression of Interest-EOI No:01/PMU of 2017-2018."Day to day operating of accounting work and maintenance and up-keeeping of accounts and finance database of Project Management Unit of West Bengal Piped Water Supply Project(Purulia) running under Society Mode"
  Download Technical Proposal_EOI 01 of PMU of 2017-2018.
  Download Financial Proposal_EOI 01 of PMU of 2017-2018.
Minutes of Stakeholders' Meeting held on June 09, 2017 at Manbazar-I Block in Purulia District for implementation of JICA assisted WBPWSP(Purulia), Loan ID P-231.
News paper ADVT. for Recruitment of contractual AE and SAE under PMU , WBPWSP(PURULIA)
Expression of Interest - EOI No :- 01/EOI/PMU of 2015-2016
  Download Technical Proposal of EOI No :- 01/EOI/PMU of 2015-2016
  Download Financial Proposal of EOI No :- 01/EOI/PMU of 2015-2016
Expression of Interest - EOI No :- PHE/WSSO/70/836 of 2014-2015 for REPUTED AGENCIES/ NON GOVERNMENT ORGANIZATIONs (NGOs)  for DESIGNING, PLANNING AND IMPLEMENTATING OF CAPACITY BUILDING, SOCIAL/COMMUNITY MOBILIZATION AND BEHAVIORAL CHANGE COMMUNICATION ACTIVITIES IN PURULIA
Expression of Interest - EOI No :- 05/EOI/PMU of 2014-2015
  Download Technical Proposal of EOI No :- 05/EOI/PMU of 2014-2015
  Download Financial Proposal of EOI No :- 05/EOI/PMU of 2014-2015
Contractual Appointment of AE and SAE under JICA assisted project
  Download Technical Proposal For EOI No : 01/EOI/PMU of 2014-2015
  Download Financial Proposal For EOI No : 01/EOI/PMU of 2014-2015
Postponment Notice of First Executive Committee Meeting
Notice Inviting Proposal No :- 01/NIP/PMU of 2013-2014
Pay & allowances of PMU
JICA Notification-Appoinment of Superintending Engineers
Notification of Project Director on 20th November 2013
JICA Notification-Appoinment of Project Director
Cancellation of NIT No. 03 of 2013-2014 for Development and Implementation of SCADA, GIS & MIS and Preparation of Operational Manual under West Bengal Piped Water Supply Project(Purulia) in District: Purulia, State: West Bengal, India
NIT-03 of 2013-2014 for Development and Implementation of SCADA, GIS & MIS and Preparation of Operational Manual under West Bengal Piped Water Supply Project(Purulia) in District: Purulia, State: West Bengal, India
Acceptance Order in respect of engagement of Local Consultant
Administrative Approval for West Bengal Piped Water Supply Project(Purulia)
Reply to Pre - Bid Queries raised by the JICA Tenderers in respect to NIT No. 2/JICA of 2013-2014(Purulia)
Corrigendum-1 of NIT-02 for Providing Engineering Consultancy Services for Survey, Investigation, Design for Implementation of West Bengal Piped Water Supply Project (Purulia)
NIT-02 for Providing Engineering Consultancy Services for Survey, Investigation, Design for Implementation of West Bengal Piped Water Supply Project (Purulia)
Cancellation of NIT-1/JICA of 2013-2014 for Providing Engineering Consultancy Services for Survey Investigation, Design for Implementation of West Bengal Piped Water Supply Project (Purulia)
Addendum No-1 For NIT-1/JICA of 2013-2014 for Providing Engineering Consultancy Services for Survey, Investigation, Design for Implementation of West Bengal Piped Water Supply Project (Purulia)
NIT for Providing Engineering Consultancy Services for Survey, Investigation, Design for Implementation of West Bengal Piped Water Supply Project (Purulia)
EOI for PROJECT MANAGEMENT CONSULTANCY (PMC) for West Bengal Piped Water Supply Project (Purulia) A JICA Aided Project